New blog site;

The slut got a new blog, and it’s moving fast! I’m giving it two more months max, that’s taking my time and doing everything correctly.

As of right now i’m just building my parts pile back up waiting for my engine to get done from the machine shop because it’s getting a lot done;

Whole supertech valve train including over sized valves etc, s13 cams, bore .020″ over, full rotating assembly balance, and cutting the head and block, and a port/polish.

Photobucket

Photobucket

Photobucket

Ordering my new radiator, need that aluminum one now that it’ll be summer. :o

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s


Follow

Get every new post delivered to your Inbox.